Ms BMM Ispat Limited vs State Load Despatch Centre
Case NumberOP/31/2025
Date of Filing25 Oct 2025
Case TypeOriginal Petition
Last Hearing--
StateKarnataka
CityBengaluru
Year of Filing--
Party Details
Petitioner
- NA BMM ISPAT LIMITEDNot Applicable AGED ABOUT 1 YEARSNot ApplicableNOT APPLICABLENO.101
- 1ST FLOOR
- PRIDE ELITE
- NO.10
- MUSEUM ROAD
- BANGALORE560001
Respondent
- STATE LOAD DESPATCH CENTRENOT APPLICABLE AGED ABOUT 1 YEARSCHIEF ENGINEERKARNATAKA STATE LOAD DESPATCH CENTREKARNATAKA POWER TRANSMISSION CORPORATION LIMITED
- 28
- RACE-COURSE ROAD
- BENGALURU 560001
Case Summary
Ms BMM Ispat Limited vs State Load Despatch Centre (Case No. OP/31/2025) is listed in the Karnataka Electricity Regulatory Commision, filed on 25 Oct 2025. The case has undergone 2 hearings over 2 months. The case is currently pending.
Hearing History (2)
6JAN 2026
Case called for hearing on 06.01.2026. Counsel for petitioner Ms. Manasa for Pragathi Law Chambers present, submits that in view of the orders of the Commission dated 12.11.2025 for having extended the time limit till 30.06.2026 for installation of standby meters to all the Open Access Generators including the present petitioner, this petition may be disposed off as it does not survive for consideration for further consideration. Commission heard the counsel, noted the submissions and disposed the present petition in terms of the Commission order dated 12.11.2025.
Judge: Two Members Bench - PRK(C)+HKJ(L)
Stage: FOR HEARING
28OCT 2025
Case called for hearing on admission on 28.10.2025 considering the memo dated 25.10.2025 filed by the petitioner for urgent listing before the Commission with notice issued to the Respondent (SLDC). Counsel Sri. Ajajy Nandalike appeared for petitioner, made submissions for extension of time period for installation of standby meter till 31.12.2025 since the Respondent has refrained to issue NoC for the month of November 2025 in view of directions of the Commission and prays to direct the Respondent to continue to issue monthly NoCs to the petitioner till the completion of the ongoing construction of the 220 KV unmanned switching station. Smt. B.K. Gayathi, Controller, RA, KPTCL present and submits that all Open Access Generators were given extension of time for installation of the standby meters till 31.10.2025 and at present all generators are urging to extend the time in view of non-availability of standby meters. Commission heard the counsel and the officer, noted their submissions and decided to extend time to install standby meter till 30.06.2026 for all generators. Office is directed to issue necessary orders.
Judge: Full Bench - PRK(C)+HKJ(L)+JA(M)
Stage: FOR ADMISSION