M/s OPWIND Energy Pvt. Limited vs GETCO
Party Details
- M/s OPWIND Energy Pvt. Limited
- GETCO
Case Summary
M/s OPWIND Energy Pvt. Limited filed Case No. 2472/2025 in the Gujarat Electricity Regulatory Commission against GETCO. The case has undergone 4 hearings over 2 months. The case is currently pending. 5 orders have been issued in this matter.
Hearing History (4)
- 31JUL 2025Hearing
Judge: N/A
Petition filed under Sections 86(1)(f), 86 (1)(c) & (e) and other applicable provisions of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business Regulations, 2004 seeking extension of time period for construction of the evacuation infrastructure till 31.12.2025 and for use of spare 220 kV Bay at 220 kV Kalawad substation on temporary basis until 31.12.2025 and for granting the rightful time to the Petitioner for commissioning of the entire capacity of 25 MW of Wind-Solar Hybrid Power at 220 kV Kalawad substation as per procedure for "Grant of Connectivity to Projects based on Renewable Sources to Intra-State Transmission System" dated 07.01.2023.
- 16JUL 2025Hearing
Judge: N/A
Petition filed under Sections 86(1)(f), 86 (1)(c) & (e) and other applicable provisions of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business Regulations, 2004 seeking extension of time period for construction of the evacuation infrastructure till 31.12.2025 and for use of spare 220 kV Bay at 220 kV Kalawad substation on temporary basis until 31.12.2025 and for granting the rightful time to the Petitioner for commissioning of the entire capacity of 25 MW of Wind-Solar Hybrid Power at 220 kV Kalawad substation as per procedure for "Grant of Connectivity to Projects based on Renewable Sources to Intra-State Transmission System" dated 07.01.2023.
- 26JUN 2025Hearing
Judge: N/A
Petition filed under Sections 86(1)(f), 86 (1)(c) & (e) and other applicable provisions of EA, 2003 r/w. Regulations 80 & 82 of GERC (Conduct of Business Regulations, 2004 seeking extension of time period for construction of evacuation infrastructure till 31.12.2025 & for use of spare 220 kV Bay at 220 kV Kalawad substation on temporary basis until 31.12.2025 & for granting the rightful time to Petitioner for commissioning of entire capacity of 25 MW of Wind-Solar Hybrid Power at 220 kV Kalawad S/s as per procedure for "Grant of Connectivity to Projects based on Renewable Sources to Intra-State Transmission System" dated 07.01.2023.
Orders (5)
- 17OCT 2025orderView Order ↗
Order No: 1
- 14AUG 2025orderView Order ↗
Order No: 1
- 19JUL 2025orderView Order ↗
Order No: 2