M/s OPWIND Energy Pvt. Limited vs GETCO

Case Number2472/2025
Date of Filing--
Case Type--
Last Hearing16 Jul 2025
State--
City--
Year of Filing2025
Party Details
Petitioner
  • M/s OPWIND Energy Pvt. Limited
Respondent
  • GETCO
Case Summary

The case M/s OPWIND Energy Pvt. Limited vs GETCO.

The case is filed in the Gujarat Electricity Regulatory Commission (Case No. 2472/2025).

The current case status is pending, last heard on 16 Jul 2025.

Hearing History (3)
16JUL 2025
Hearing

Judge: N/A

Petition filed under Sections 86(1)(f), 86 (1)(c) & (e) and other applicable provisions of the Electricity Act, 2003 read with Regulations 80 and 82 of the GERC (Conduct of Business Regulations, 2004 seeking extension of time period for construction of the evacuation infrastructure till 31.12.2025 and for use of spare 220 kV Bay at 220 kV Kalawad substation on temporary basis until 31.12.2025 and for granting the rightful time to the Petitioner for commissioning of the entire capacity of 25 MW of Wind-Solar Hybrid Power at 220 kV Kalawad substation as per procedure for "Grant of Connectivity to Projects based on Renewable Sources to Intra-State Transmission System" dated 07.01.2023.

26JUN 2025
Hearing

Judge: N/A

Petition filed under Sections 86(1)(f), 86 (1)(c) & (e) and other applicable provisions of EA, 2003 r/w. Regulations 80 & 82 of GERC (Conduct of Business Regulations, 2004 seeking extension of time period for construction of evacuation infrastructure till 31.12.2025 & for use of spare 220 kV Bay at 220 kV Kalawad substation on temporary basis until 31.12.2025 & for granting the rightful time to Petitioner for commissioning of entire capacity of 25 MW of Wind-Solar Hybrid Power at 220 kV Kalawad S/s as per procedure for "Grant of Connectivity to Projects based on Renewable Sources to Intra-State Transmission System" dated 07.01.2023.

27MAY 2025
Hearing

Judge: N/A

Petition filed under Sections 86(1)(f), 86 (1)(c) & (e) and other applicable provisions of EA, 2003 read with Regulations 80 & 82 of the GERC (Conduct of Business Regulations, 2004 seeking extension of time period for construction of the evacuation infrastructure till 31.12.2025 and for use of spare 220 kV Bay at 220 kV Kalawad substation on temporary basis until 31.12.2025 and for granting the rightful time to Petitioner for commissioning of the entire capacity of 25 MW of Wind-Solar Hybrid Power at 220 kV Kalawad substation as per procedure for "Grant of Connectivity to Projects based on Renewable Sources to Intra-State Transmission System" dated 07.01.2023.

Orders (3)
19JUL 2025
order

Order No: 1

View Order ↗
1JUL 2025
order

Order No: 2

View Order ↗
4JUN 2025
order

Order No: 3

View Order ↗