Meta Pixel
Need Help? — Visit Our Help Center for Smarter Legal Operations
Learn More
CNR: --
DISPOSED

POWERGRID Southern Interconnector Transmission System Limited (PSITSL) vs Central Electricity Regulatory Commission

Case Number69/TL/2022
Date of Filing--
Case Type--
Last Hearing--
StateDelhi
CityDelhi
Year of Filing2022
Party Details
Petitioner
  • POWERGRID Southern Interconnector Transmission System Limited (PSITSL)
Respondent
  • Central Electricity Regulatory Commission
Case Summary

The case POWERGRID Southern Interconnector Transmission System Limited (PSITSL) vs Central Electricity Regulatory Commission.

The case is filed in the Central Electricity Regulatory Commission (Case No. 69/TL/2022).

The current case status is disposed and the matter is at the Disposed of stage.